Duero Lookout

Design Architectural Design Structural Design
Architecture & Interior Design Sustainability Structural Design

The biggest challenge of the project was the static solution for the cantilever platform. The old vantage point was on a heavily indented mass of rock resting on an inclined plane. For this reason, the static approach of the new vantage point is based on a foundation plate that is stuck in the rock massif as a counterweight. As a result, the less stable rock area is not stressed.

https://www.hollegha.com/mirador-arribes/